Martin Luther King Jr. Academy
LOCATION: Yonkers
CATEGORY: K-12 School
Gym, Hallway, Cafeteria Renovations
This project was a 13,000 sq. ft. renovation of the schools cafetorium, gymnasium and connecting corridors. We performed asbestos abatement; installed new flooring, wall pads, acoustical ceilings, wall panels, and electrical and control upgrades; painted; and provided stage upgrades.
Scroll to Top